CFD series cup filling and sealing machine for sauce (mushroom sauce, beef sauce, chili sauce, tea sauce)(2)

Short Description:

*Product application scope:This machine is suitable for filling cup sauce and sealing with single film.such as mushroom sauce, beef sauce, chili sauce and other materials.


Product Detail

Product Tags

Product Video

Product Description

*Material and structural description of the entire machine:

① The frame adopts SUS304 # stainless steel square tube welding;

② The material contact part is made of 304 # stainless steel material;

③ The control cabinet and filling part are designed separately, making cleaning more convenient;

④ Install a waste recycling tank below the rack;

*Work flow: automatic feeding cup→automatic pressing cup→UV lamp sterilization→quantitative filling→automatic suction and discharge of single film→sealing I→sealing II→cold sealing III→mechanical top cup→reverse cup→mechanical top cup output, the whole process is fully automated control.

Product parameters

Model

CFD-4

CFD-6

CFD-8

CFD-16

Production rate

3500-4500 cups/H

5000-5600cups/H

7000-7600 cups/H

12000-13000 cups/H

Filling Volume

250-500g

100-200g

100-200g

100-200g

Machine Power

3-phase 4-lines/380V/50/Hz

Air Consumption

0.8-1.0 m³/min  0.7-0.8Mpa

Machine Dimension 5200x800x1900mm(L x W x H) 5200x1000x1900mm(L x W x H) 5200x1200x1900mm(L x W x H) 8000x1200x1900mm(L x W x H)

*We can design new models according to users' needs.

Why did you choose us

1. What is your delivery time?
Answer: Normally, our delivery time is within 40 days after the contract is confirmed and the deposit is received, while larger production lines require 60 to 90 days.
2. What is your payment method?
We accept T/T (40% deposit and 60% withdrawal payment).
3. With so many suppliers, why did we choose you as our business partner?
We have been focusing on the design and production of equipment for over 20 years, with customers both domestically and internationally, accumulating a lot of experienc.
4. With so many suppliers, why did we choose you as our business partner?
We have been focusing on the design and production of equipment for over 20 years, with customers both domestically and internationally, accumulating a lot of experience.
5. What is your delivery time?
Answer: Normally, our delivery time is within 40 days after the contract is confirmed and the deposit is received, while larger production lines require 60 to 90 days.

FAQ

1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.


  • Previous:
  • Next: