CHCFD series cup and bowl fast food filling vacuum sealing machine

Short Description:

*Product application scope:This machine is suitable for filling and vacuum sealing of cup / bowl materials.It is suitable for packaging containers with different shapes and capacities.


Product Detail

Product Tags

Product Video

Product Description

*Material and structural description of the entire machine:

① The frame adopts SUS304 # stainless steel square tube welding;

② The material contact part is made of 304 # stainless steel material;

③ The control cabinet and filling part are designed separately, making cleaning more convenient;

④ Equipped with air storage tanks on the equipment to improve air pressure stability;

⑤ Adopting centralized exhaust technology to reduce noise and pollution.

*Work flow: manual material release→quantitative filling→film release→electric eye detection→vacuum sealing I→electric eye correction→vacuum sealing II→shearing→collecting waste film→withdrawing cup, the whole process is automated control.

Product parameters

Model

CFD-4

CFD-5

CFD-6

Production rate

2500-3300 cups/H

3000-3800 cups/H

3600-4600 cups/H

Filling Volume

250-500ml

250-500ml

250-500ml

Machine Power

3-phase 4-lines/380V/50/Hz

Air Consumption

0.7-0.8 m³/min  0.5-0.8Mpa

Machine Dimension

5000x860x2100mm

(L x W x H)

5000x960x2100mm

(L x W x H)

5000x1060x2100mm

(L x W x H)

*We can design new models according to users' needs.

Our Advantages

1. Fast delivery time: We have our own factory and professional manufacturers, which saves you time negotiating with trading companies. We will do our best to meet your requirements.
2. A professional online service team will respond to any emails or messages within 24 hours.
3. We adhere to customer first, and our employees move towards happiness.

FAQ

1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.


  • Previous:
  • Next: