CFD series cup filling and sealing machine for oils and fats (butter, olive oil, peanut oil)

Short Description:

*Product application scope:This machine is suitable for filling and sealing cup of butter, olive oil and peanut oil.


Product Detail

Product Tags

Product Video

Product Description

*Material and structural description of the entire machine:

① The frame adopts SUS304 # stainless steel square tube welding;

② The material contact part is made of 304 # stainless steel material;

③ The control cabinet and filling part are designed separately, making cleaning more convenient;

④ The equipment is equipped with a laminar flow purification hood to improve the cleanliness of filling;

⑤ Install a waste recycling tank below the rack;

⑥ Using brushed square tubes to make door frames+organic glass.

*Work flow: automatic feeding cup→automatic pressing cup→servo quantitative filling→unwinding film→automatic printing of production date→electric eye detection→sealing I→electric eye correction→sealing II→shearing→collecting waste film→manipulator grabbing and withdrawing cup,the whole process is fully automated control.

Product parameters

Model

CFD-4

CFD-6

Production rate

3500-4500 cups/H

5000-5600 cups/H

Filling Volume

150-200g

100-150g

Machine Power

3-phase 4-lines/380V/50/Hz

Air Consumption

0.8-1.0 m³/min  0.7-0.8Mpa

Machine Dimension

6200x1050x2400mm

(L x W x H)

6200x1300x2400mm

(L x W x H)

*We can design new models according to users' needs.

Why did you choose us

1. Regarding the order quantity: We can adjust it according to your requirements.
2. We provide the best service because we have an experienced sales team already working for you.
3. Regarding exchange. Please email me or chat with me at your convenience.
4. Regarding the price. The price is negotiable. It can be changed according to your quantity.

FAQ

1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.


  • Previous:
  • Next: