CFD series cup beverage juice filling and sealing machine (single film and roll film dual purpose sealing machine)

Short Description:

*Product application scope:This machine is suitable for filling and sealing cup juice and beverage.


Product Detail

Product Tags

Product Video

Product Description

*Material and structural description of the entire machine:

① The frame adopts SUS304 # stainless steel square tube welding;

② The material contact part is made of 304 # stainless steel material;

③ The control cabinet and filling part are designed separately, making cleaning more convenient;

④ Install a waste recycling tank below the rack;

*Work flow: automatic cup feeding→fruit meat adding→quantitative filling I→freeze→quantitative filling II→automatic suction and discharge of single film→unwinding film→electric eye detection→sealing I→electric eye correction→sealing II→shearing→collecting waste film→withdrawing cup, the whole process is fully automated control.

Product parameters

Model CFD-4 CFD-6
Production rate 3500-4400 cups/H 5000-6000 cups/H
Filling Volume 250-500ml 250-500ml
Machine Power 3-phase 4-lines/380V/50/Hz
Air Consumption 0.8-1.0 m³/min  0.6-0.8Mpa
Machine Dimension 5900x900x1900mm(L x W x H) 5900x1100x1900mm(L x W x H)

*This machine adopts single film or roll film for sealing, users can switch according to the actual production demand, and select the automatic switch through the touch screen operation mode.
*We can design new models according to users' needs.

FAQ

1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.


  • Previous:
  • Next: