CFD series cup filled double or three color jelly and pudding filling and sealing machine

Short Description:

*Product application scope:This machine is suitable for filling and sealing of two-color or three-color jelly and pudding.


Product Detail

Product Tags

Product Video

Product Description

*Material and structural description of the entire machine:

① The frame adopts SUS304 # stainless steel square tube welding;

② The material contact part is made of 304 # stainless steel material;

③ The control cabinet and filling part are designed separately, making cleaning more convenient;

*Work flow: automatic cup feeding→fruit meat adding→quantitative filling I→freeze→quantitative filling II→unwinding film→electric eye detection→sealing I→electric eye correction→sealing II→shearing→collecting waste film→Cleaning template→withdrawing cup, the whole process is fully automated control.

Product parameters

Model

CFDS-4

CFDS-6

CFDS-12

Production rate

3600-4000 cups/H

5500-6000 cups/H

10000-12000 cups/H

Filling Volume

30-120ml

20-100ml

20-100ml

Machine Power

3-phase 4-lines/380V/50/Hz

Air Consumption

0.7-0.8 m³/min  0.5-0.7Mpa

Machine Dimension 11000x1000x1800mm(L x W x H) 11000x1000x1800mm(L x W x H) 11000x1000x1800mm(L x W x H)

*This machine is equipped with rapid freezing device, which can be layered filling, cooling and continuous production.
*We can design new models according to users' needs.

Our Advantages

1. We have our own factory, forming a professional production system from material supply, manufacturing to sales, and have a professional R&D and QC team. We always keep ourselves up-to-date with market trends. We are willing to introduce new technologies and services to meet market demands.
2. We have a strong team that always provides customers with wholehearted service.
3. Good quality: Good quality can be guaranteed, which will help you maintain a good market.

FAQ

1.What is the price of this device?
It depends on your company's technical requirements for the equipment, such as using domestic or foreign brands for related accessories, and whether other devices or production lines need to be matched. We will make accurate plans and quotations based on the product information and technical requirements you provide.
2.How long is the delivery time approximately?
The delivery time for a single device is generally 40 days, while large-scale production lines require 90 days or more; The delivery date is based on the confirmation of the order by both parties and the date we receive the deposit for your products and equipment. If your company requires us to deliver a few days in advance, we will do our best to meet your requirements and complete the delivery as soon as possible.
3. Payment method?
The specific remittance method shall be agreed upon by both parties. 40% deposit, 60% pick-up payment.


  • Previous:
  • Next: